Metrics catalogueService levels, research results and acceptance checks stay separate.
Each number has one job. Operational SLOs describe the running system, Nova research metrics describe a fixed evaluation, and acceptance checks decide whether a client contour can enter Run.
Operational SLOWhat the running system must hold.
- Nova signal generation
- < 200 ms from event detection
- Contour availability
- 99.97% trailing 12 months
- Aegis stale-feed block
- 100% of automated orders
- Duplicate order on retry / failover
- 0
- Elara state change without approval
- 0
- Iris release with mandatory regression
- 0
Nova researchA versioned research result.
- Directional accuracy
- 73.4% · 30-day horizon · 2020–2026
- Costs
- Fees and slippage included
- Regimes
- Bull, bear, sideways and stress
- Universe
- 500+ spot, futures and options pairs
Backtested research performance is not live PnL and does not replace a fund mandate.
Package acceptanceThe gate before production.
- Nova keeps the source window and model version with every signal.
- Atlas cites each material claim and separates fact from interpretation.
- Aegis checks live exposure and blocks on stale state.
- Ava reaches at least 90% citation coverage on the agreed set with no cross-role disclosure.
- Elara reaches at least 85% routing accuracy and records approval for every state change.
- Iris records every dataset and system version; mandatory regression means block.
Technical evidence
See how the Nova result is carried into a decision.
Open technical case →